CONFIDENTIAL REPORT 2G-21
S2
   
S3
   
S4
   
S5
   
S6
   
S7
     
 
FORMER GERMAN SUBMARINE TYPE XXI
 
     
 
ADMINISTRATIVE EXPENSE MOULDS
INSPECTION AND PLANNING LAUNCHING
PREPARATION INCIDENT TO BUILDING DOCKING
 
     
 
SUMMARY
 
     
          Information with respect to administration of the shipbuilding, inspections and planning, preparations for building, moulds, launching and docking is available in the reports of the Naval Technical Mission in Europe which cover these phases of the German Shipbuilding program.  Inasmuch as no local information supplements these reports, this page is inserted for reference.  
     
 
March, 1946
 
 
 
 
PORTSMOUTH NAVAL SHIPYARD, PORTSMOUTH, N. H.